Operation CHARM: Car repair manuals for everyone.

Shift Interlock Switch: Testing and Inspection




Park Pin Switch Test

1. Remove the driver's center console trim.

2. Disconnect the 6P connector (A) from the shift lock solenoid/park pin switch/AT gear position indicator panel light connector (B).





3. Check for continuity between terminals No. 1 and No. 2.

- There should be continuity when the shift lever is moved out of P.

- There should be no continuity when the shift lever is moved to P.

4. If the continuity is not as specified, replace the park pin switch Service and Repair.