Operation CHARM: Car repair manuals for everyone.

Shift Solenoid Valves A and B (2)

Test





1. Measure the resistance between the No. 2 terminal of the shift solenoid valve/A/T clutch pressure control solenoid valve harness connector and body ground, and between the No. 1 terminal and body ground.
STANDARD: 14 - 25 Ohms
2. Replace the shift solenoid valves A and B if the resistance is out of specification.





3. If the resistance is within the standard, connect the No. 2 terminal of the shift solenoid valve/A/T clutch pressure control solenoid valve harness connector to the battery positive terminal. A clicking sound should be heard. Connect the No. 1 terminal to the battery positive terminal. A clicking sound should be heard. Replace the shift solenoid valves A and B if no clicking sound is heard.