Cruise Control Vacuum Solenoid: Testing and Inspection
Actuator Solenoid Test1. Disconnect the 4P connector from the actuator.
2. Check for resistance between the terminals accordmg to the table.
NOTE: Resistance will vary slightly with temperature; specified resistance is at 70 °F (20 °C).