ABS Main Relay: Testing and Inspection
1. Check for continuity between terminals (3) and (4). There should be no continuity.
2. Connect a 12 V battery across terminals (1) and (2). There should be continuity between terminals (3) and (4).
NOTE: All ABS relays are tested using this procedure.