A/T Clutch Pressure Control Solenoid Valve
Test1. Disconnect the transmission sub-harness connector (14P).
2. Measure the resistance between the No. 8 and No. 9 terminals of the transmission sub-harness connector.
STANDARD: 4.0 - 6.0 Ohms (at 70°F, 20°C)
3. If the resistance is out of specification, remove the shift cable cover, and disconnect the shift solenoid valve/A/T clutch pressure control solenoid valve harness connector.
4. Measure the resistance between the No. 3 and No. 4 terminals of the shift solenoid valve/A/T clutch pressure control solenoid valve harness connector.
STANDARD: 4.0 - 6.0 Ohms (at 70°F, 20°C)
- If the resistance is within specification, replace the transmission sub-harness.
- If the resistance is out of specification, replace the A/T clutch pressure control solenoid valve.
5. If the resistance is within the standard, connect the No. 4 terminal of the shift solenoid valve/A/T clutch pressure control solenoid harness connector to the battery positive terminal, and connect the No. 3 terminal to the battery negative terminal. A clicking sound should be heard. If no clicking sound is heard, replace the A/T clutch pressure control solenoid valve.
NOTE: If A/T clutch pressure control solenoid valve replacement is required, see these headings:
- Lower Valve Body
Removal/Installation
Disassembly/Reassembly
- Throttle Valve Body/A/T Clutch Pressure Control
Solenoid Valve