M/T Countershaft Reassembly
M/T Countershaft Reassembly
Exploded View
Special Tools Required
- Driver, 58 x 62 mm 070AD-PYZA100
- Driver Handle, 40 mm I.D. 07746-0030100
NOTE: Refer to the Exploded View, as needed, during this procedure.
1. Clean all parts in solvent, dry them, and apply MTF to all contact surfaces.
2. Install the countershaft reverse gear (A) with the needle bearing (B), and 1st gear (C) onto the countershaft (D).
3. Install the triple cone synchro assembly (A) with the synchro spring (B) by aligning the synchro cone fingers (C) with the holes (D) in 1st gear.
4. Install the 1st/2nd synchro hub (A) by aligning the synchro ring fingers (B) with the grooves (C) in the 1st/2nd synchro hub.
5. Install the 1st/2nd synchro sleeve (A) by aligning the slots of the 1st/2nd synchro sleeve and the 1st/2nd synchro hub (B). After installing, check the operation of the 1st/2nd synchro hub set.
NOTE: Make sure to align the slots in the 1st/2nd synchro hub as shown.
6. Install the triple cone synchro assembly (A) with the synchro spring (B) by aligning the synchro ring fingers (C) with the grooves (D) in the 1st/2nd synchro hub.
7. Install the 2nd gear distance collar (A) with the needle bearing (B).
8. Install 2nd gear (A) by aligning the synchro cone fingers (B) with the holes in 2nd gear (C).
9. Support the countershaft (A) on steel blocks, then press on 3rd gear (B) using the 58 x 62 mm driver (C) and a press (D).
NOTE: Do not exceed the maximum pressure.
10. Press on 4th gear (A) using the 58 x 62 mm driver (B) and a press (C).
NOTE: Do not exceed the maximum pressure.
11. Press on 5th gear (A) using the 40 mm I.D. driver handle (B) and a press (C).
NOTE: Do not exceed the maximum pressure.
12. Press on 6th gear (A) using the 40 mm I.D. driver handle (B) and a press (C).
NOTE: Do not exceed the maximum pressure.
13. Install the 35 mm shim (A), and temporarily press on the used ball bearing (B) using the 40 mm I.D. driver handle (C) and a press (D).
NOTE:
- Use any size of 35 mm shim, and note size you used. Measurements taken in the following steps will determine the correct shim to use for final assembly.
- Make sure the ball bearing is installed in the correct direction.
14. Measure the clearance between the ball bearing (A) and the 35 mm shim (B) with a feeler gauge (C).
15. If the measured clearance in step 14 is not within the standard, select another suitable 35 mm shim from the table, then go to next step to replace the 35 mm shim and the ball bearing with new ones. If the measured clearance in step 14 is within the standard, go to the next step to replace only the ball bearing with a new one.
35 mm Shim
16. Remove 6th gear with the ball bearing and the 35 mm shim using a press.
17. Repeat step 12 to install 6th gear.
18. Install the correct 35 mm shim (A) and a new ball bearing (B) using the 40 mm I.D. driver handle (C) and a press (D).
NOTE:
- If necessary, replace the 35 mm shim with the correct one selected in step 15.
- Make sure the ball bearing is installed in the correct direction.
19. Recheck the clearance between the ball bearing and the 35 mm shim with a feeler gauge.
20. Securely clamp the countershaft assembly in a bench vise with wood blocks (A).
21. Tighten a new special bolt (B) (left-hand threads).
NOTE: Apply new MTF to the bolt threads and flange.