Component Testing Sequence
Note: Components are tested in following sequence:^ Control head
^ Programmer
^ Blower Control Unit (Power module)
For each component, all inputs must be OK before correct outputs will be obtained.
All voltage specifications are for a workshop temperature of 68°F (2O°C).
Use digital voltmeter for all tests (US 1119).
All tests are performed with all components connected unless otherwise indicated.