Exhaust System /Aligning without tension

Exhaust system, aligning without tension

Align the exhaust system as follows to prevent noise due to incorrect tension:

Notes:

^ Loosen all threaded connections (except exhaust manifold) including front exhaust pipe/transmission brackets.

^ The dimensions given on the illustrations are approximate figures for reference.

^ Align exhaust system cold.

^ Adhere exactly to the sequence of operations which follows.





- Align left front exhaust pipe with TWC -A- and right front exhaust pipe with TWC -B-.

^ Dimension -a- between flange connection and cross brace -C- = approx. 60 mm

^ Distance between front TWO and transmission must be at least 7 mm (0.28 in.)

Exhaust Flange Tightening Sequence:





- Tighten nuts on front exhaust pipe flange connections to left and right exhaust manifold

^ tightening torque: 30 Nm (22 ft lb)

Caution!
Tighten the two front exhaust pipes uniformly and in the sequence shown.

Note:
The flanges of the front exhaust pipes are shown from below. The -arrow- points toward the front of the vehicle.

- Adjust initial tension of exhaust system on front holding strap on center muffler

Exhaust Hanger Clearance:





- Correct dimension -a- to 7-9 mm by pushing part in double clamp. -Arrow- points toward front of vehicle.

- Bend securing straps on brackets over approx. 900 after holding loops are installed.

^ Dimension -b- between holding loop and securing straps must be at least 2 mm (0.078 in.) on both brackets

Exhaust Pipe Clearance:





- Align end pipes as shown in illustration.

^ Distance -a- right = distance -a- left

Note:
If repairing or replacing, the rear muffler must be aligned on the left rear muffler bracket.

Exhaust Hanger Clearance:





- Correct initial tension by sliding part in short double clamp between center muffler and rear muffler. -Arrow- points toward center of vehicle.

^ dimension -a- = 12- 14 mm (0.47 -0.55 in.)

Exhaust Clamp Clearance:





^ Installation position of double clamp between center muffler and rear muffler, dimension -a- = approx. 350

^ Double clamp must be centered between ends of pipes

Notes:

^ Double clamp shown is seen from below toward front of vehicle.

^ Tighten nuts uniformly, 40 Nm (30 ft lb).

Exhaust Clamp Clearance:





- Align and tighten double clamp between intermediate pipe and center muffler.

^ Dimension -a- = 30°

^ Dimension -b- = 25 - 30 mm (1 - 1.2 in.)

Notes:

^ Double clamp shown is seen from below toward front of vehicle.

^ Tighten nuts uniformly, 40 Nm (30 ft lb).

- Tighten front exhaust pipe brackets free of tension.

Exhaust system, checking for leaks

- Start engine

- Close end pipes for duration of leak testing using rags, plugs etc.

- Check connection points, e.g. cylinder head/manifold, manifold/front exhaust pipe, etc., for leaks by listening.

- Repair all leaks found.