Power Locks
Central locking system
Assembly Overview:
1 - Vacuum line
2 - Right-front door lock actuator
- Removing and installing.
3 - Vacuum line connectors
- Disengage harness connectors.
- Additional vacuum line connectors are located at bottom of A-pillar and in boot at B-pillar
4 - Right-rear door lock actuator
- Removing and installing.
5 - Fuel filler flap lock actuator
- Removing and installing.
6 - Central locking system pump
- Removing and installing.
7 - Distribution box
- Connected with all other wires excluding wire for rear lid
8 - Left-front door lock actuator
- Removing and installing same as for right door
9 - Rear lid lock actuator
- Removing and installing.
10 - Left-rear door lock actuator
- Removing and installing same as for right door
Central locking system (Avant)
1 - Pressure and vacuum lines
2 - Right-front door actuator valve
- Removing and installing.
3 - Vacuum line connectors
- Disconnect vacuum line connectors.
4 - Right-rear door actuator valve
- Removing and installing.
5 - Fuel filling flap lock actuator
- Removing and installing.
6 - Central locking system pump
- Removing and installing.
7 - Rear lid lock actuator
- Removing and installing.
8 - Left-rear door actuator valve
- Removing and installing same as for right door
9 - Left-front door lock actuator
- Removing and installing same as for right door
10 - Distribution box
- Connected with all other vacuum lines, excluding lines for rear lid