Note
Note:
- Observe rules of cleanliness.
- Boost pressure control connection diagram. Refer to Boost pressure control system overview.
- All hose connections are secured with hose clamps
- Boost pressure system must be free of leaks.
- Replace self-locking nuts.
- Always replace gaskets.