Operation CHARM: Car repair manuals for everyone.

Lifting Vehicle, Suspension



Lifting Vehicle, Suspension: 1BA, 1BC, 1BE, 1BG, 1BH, 1BP, 1BT, 1BJ

Notes:
^ For the next work sequence it must be ensured that the wheels do not lose contact with the turn-tables during the lifting operation!
^ If this does happen, do not move the turntables as this would result in incorrect measurements.

^ Position axle lift under front jacking points and raise vehicle.

Note: Vehicle will be lifted 60 mm.





^ Slide cylinders out at the threaded spindles and secure in position with locking pins.
^ Ensure that the locking pins -arrows- are correctly positioned!
^ Lower vehicle onto VAG 1925 spacer gauge.