Operation CHARM: Car repair manuals for everyone.

With Generic Scan Tool



Leak Detection Pump (LDP) -V144-, Checking

Recommended special tools and equipment







- VAG1526A multimeter
- VAG1594A connector test kit
- VAG1598/31 test box

Test requirements:
- Fuse for Leak Detection Pump (LDP) -V144- OK
- Fuel Pump (FP) Relay OK. Testing and Inspection
- Ignition switched off.

NOTE: Voltage is supplied to Leak detection pump (LDP) -V144- via the Fuel Pump (FP) relay.

Procedure
- Remove left rear wheel.
- Remove rear left wheelhousing liner.







- Release and disconnect harness connector -3-.

Checking internal resistance







- Connect multimeter for resistance measurement as follows.

Leak Detection Pump (LDP) -V144- Terminal Specified value
1 + 3 640 ... 720 Ohm
2 + 3 15 ... 17 Ohm

If specified values are not obtained:

- Replace Leak Detection Pump (LDP) -V144-, item 11

If specified values are obtained:

Checking voltage supply







- Connect multimeter for voltage measurement as follows:

Harness connector Measure to
Terminal

3 Engine Ground (GND)

- Operate starter briefly.
- Specified value: approx. battery voltage
- Switch ignition off.

If specified value is not obtained:
- Check wire connection from harness connector terminal 3 to Fuel Pump (FP) Relay -J17- via fuse for open circuit according to wiring diagram.
- Specified value: Wire resistance max 1.5 Ohm

- If necessary, repair wire connection.

If voltage supply is OK:

Checking wire connections
- Connect test box to wiring harness of Engine Control Module (ECM); ECM is not connected. Text Box, Connecting For Wiring Test







- Check the following wire connections for open circuit according to wiring diagram:

Harness connector Test box
Terminal Socket

1 80
2 25

- Specified value: Wire resistance max 1.5 Ohm

- Also check wires for short circuit to each other as well as to B+ and Ground (GND).
- Specified value: (no continuity)
- If necessary, repair wire connection.

If no malfunctions are found in wires:
- Replace Engine Control Module (ECM).

Final procedures
After repair work, the following work steps must be performed in the mentioned sequence:
1 - Check DTC memory, "Mode 3: Check DTC memory". Diagnostic Mode 3: Check DTC Memory
2 - If necessary, erase DTC memory, "Mode 4: Reset/erase diagnostic data". Diagnostic Mode 4: Check Reset/Erase Diagnostic Data
3 - Generate readiness code. Readiness Code, Generating

- End diagnosis and switch ignition off.