Combination Valve For Secondary Air Injection (Air) System, Checking Function and For Proper Seal
Combination Valve For Secondary Air Injection (AIR), Checking Function And Proper Seal
Special tools and equipment
- VAG1390 Hand vacuum pump
Requirements
- Vacuum lines and hose connections leak-free.
- Vacuum lines not clogged.
Work sequence
- Remove rear engine cover (arrows).
- Remove bolts for holding plate for solenoid valves (arrows).
- Lift up holding plate and disconnect vacuum hose from Y-piece of combination valve to be checked.
- Connect VAG1390 hand vacuum pump to vacuum hose of combination valve to be checked.
- For vehicles with auxiliary heater, remove bolts (arrows) for exhaust pipe of auxiliary heater at sound insulation.
- Remove bolts or release quick-release screws -1- and -2- and remove front sound insulation.
- Disconnect pressure hose (arrow) at Secondary Air Injection (AIR) pump motor and blow into it with light pressure (do not use pressurized air).
- Both combination valves must be closed, it must not be possible to blow through hose
- Operate hand vacuum pump.
- Relevant combination valve must open, it must be possible to blow through
If the relevant combination valve does not open:
- Replace combination valve.