Operation CHARM: Car repair manuals for everyone.

Manual Transmission



Engine, securing to assembly stand

Special tools, testers and auxiliary items required





^ Lifting tackle 2024 A
^ Engine and transmission holder VAS 6095 with bracket VAS 6095/1-5
^ Shop crane VAS 6100
^ Lift arm extension for workshop crane VAS 6101

Work procedure
^ Engine separated from transmission.





- Hook engine sling 2024 A onto engine and onto workshop crane VAS 6100 with lift arm extension for workshop crane VAS 6101 as shown in the illustration.

Note:
^ To be aligned to the center of gravity of the engine assembly, the hole rails of the lifting hook must be inserted as shown in the illustration.

CAUTION! Lifting hooks and alignment pins on the engine sling must be secured with securing pins - arrows -.





- Remove bolts - arrows - and remove left and right engine support.

Note:
^ Ignore - 1 -.





- Secure engine on Engine and Transmission Holder VAS 6095 with bracket for V6 FSI engine VAS 6095/1-5 as shown in illustration.