Operation CHARM: Car repair manuals for everyone.

With 4.2L FSI






Generator

Special tools, testers and auxiliary items required

Hose clamps up to 25 mm (3094)

Hose clamp pliers (VAS 6340)

Hose clip pliers (VAS 6362)

Removing





- With ignition switched off, disconnect battery ground (ND) wire. Refer to => [ Battery, Disconnecting and Connecting ] Battery, Disconnecting and Connecting.


Hot vapor/hot coolant may escape when opening expansion tank. Cover cap with cloth and open carefully.

- Open cap of coolant expansion tank.

- Unfasten quick-release fasteners - 1 - and detach front noise insulation.

Ignore items - 2 to 4 -.

- Remove bolts - arrows - and remove wires with connected hoses - 1 through 4 - from lock carrier.





Before removing, mark direction of ribbed belt with chalk or felt-tipped pen. Reversing the direction of rotation of a run-in ribbed belt can destroy the belt.





- Pivot tensioner in - direction of arrow - to release tension on ribbed belt.

- Remove ribbed belt and release tensioner.

- Remove screws - arrows -.





- Remove tensioner for ribbed belt from upper part of oil pan.

- Free up secondary air injection (AIR) air guide hose - 1 - on ATF cooler.





- Remove bolts - arrows - and remove ATF cooler.

- Tie ATF cooler with connected coolant hoses and ATF lines on up on engine carrier.

- Clamp off coolant hoses - arrows - with (3094).





Place a rag under separating point to catch escaping coolant.

- Disconnect coolant hoses - arrows - from coolant pipes.

- Disconnect electrical harness connector - 3 - at generator.

- Remove terminal 30/B+ - item 1 -.

Disregard item - 3 -.

- Remove the bolts - arrows - and remove generator.





If generator is stuck in its bracket, screw in mounting bolts again except 2 rotations.

Carefully strike on bolt heads using flat side of hammer - doing this loosens sleeves of generator mount.

Installing

Install in reverse order of removal, observing the following:

Secure all hose connections using standard hose clamps.

- slightly drive back sleeves for retaining bolts in order for easier installation of generator.

Tight sleeves for generator mount must be made smooth-running, otherwise clamping force of sleeve is too little despite correct torque.

- Place ribbed belt - 2 - over belt pulleys in the specified sequence.





1 Generator
3 Idler pulley
4 Vibration damper
5 Tension roller

When installing poly V-belt, make sure it is properly seated on pulleys.

- Connect battery. Required actions, refer to => [ To connect, connect terminal clamp of ground (GND) wire by hand to battery negative terminal and tighten nut. ] Battery, Disconnecting and Connecting.

- Check coolant level.

- Start engine and check belt routing.

Tightening Specifications