Secondary Air Injection (AIR) Combination Valve, Checking Function and for Leaks
Secondary Air Injection (AIR) Combination Valve, Checking Function and for Leaks
Special tools, testers and auxiliary items required
• Hand vacuum pump (VAG 1390)
Test Prerequisites
• Vacuum lines and hose connections free of leaks.
• Vacuum lines not plugged.
Test Sequence
- Remove the engine cover - 1 - upward.
- Disconnect the vacuum hose - arrow - from the Secondary Air Injection (AIR) combination valve to be checked.
- Connect the (VAG 1390) to the vacuum hose for the AIR combination valve to be checked.
• Illustration shows the engine from the rear.
• Left AIR combination valve is shown in the illustration.
- Remove the noise insulation fasteners - 1 - and noise insulation.
- Disconnect the pressure hose - 2 - from the AIR pump motor (V101) and blow into it with light pressure (do not use pressurized air).
• Both AIR combination valves must be closed, it must not be possible to blow through the hose.
- Operate the (VAG 1390).
• The relevant AIR combination valve must open, it must not be possible to blow through
If the relevant AIR combination valve does not open:
- Replace the AIR combination valve, refer to one of the following:
• Left side, refer to => [ Secondary Air Injection (AIR) Combination Valve ] Left Side Components.
• Right side, refer to => [ Secondary Air Injection (AIR) Combination Valve ] Right Side Components.