Camshaft Adjustment Valves, Checking
Diagnostic Procedures
Camshaft Adjustment Valves, Checking
Function
The camshaft adjustment is load- and RPM dependent. The electrical valves for camshaft adjustment switch oil pressure onto camshaft adjusters (mechanical adjustment mechanisms), which then adjust the camshafts.
Special tools, testers and auxiliary items required
• Hand multimeter (V.A.G 1526) or Multimeter (V.A.G 1715)
• Test adapter kit (V.A.G 1594)
• Wiring diagram
Test Conditions
• Motronic Engine Control Module (ECM) Power Supply Relay (J271) -position 4- must be OK, check:
• The Ground (GND) connections between engine and body must be OK.
• Ignition switched off.
• Fuses in right instrument panel fuse holder must be OK:
Right instrument panel fuse holder
Test Sequence
Cylinder bank 1
- Disconnect corresponding 2-pin harness connector from respective valve for camshaft adjustment:
2 Camshaft Adjustment Valve 1 (N205) - 1 -
3 Camshaft Adjustment Valve 1 (exhaust) (N318) - 1 -
Cylinder bank 2
- Disconnect corresponding 2-pin harness connector from the respective valve for camshaft adjustment:
2 Camshaft Adjustment Valve 2 (exhaust) (N319) - 2 -
3 Camshaft Adjustment Valve 2 (N208) - 2 -
Cylinder bank 1 and 2
• Before disconnecting harness connectors, mark allocation to component.
• Cylinder bank 1 with cylinders 1 through 6 is located at right in direction of travel.
• Cylinder bank 2 with cylinders 7 through 12 is located at left in direction of travel.
Checking resistances
- Check resistance between terminals at connector to respective valve for camshaft adjustment. Specification: 10.0 to 18.0 ohms
If specification is not obtained:
- Replace respective control housing with both camshaft adjustment valves.
- Erase DTC memory of Engine Control Module => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09, Diagnostic mode 4: Reset/erase diagnostic data.
- Generate readiness code => [ Readiness Code, Generating ] Monitors, Trips, Drive Cycles and Readiness Codes.
If specification is obtained:
- Check wires to Engine Control Module according to wiring diagram.
1Checking wires to Engine Control Module (ECM)
Cylinder bank 1
- Connect test box to Engine Control Module (ECM) (J623) wiring harness on connecting test box for wiring test, refer to Repair Manual,
Cylinder bank 2
- Connect test box to Engine Control Module (ECM) 2 (J624) wiring harness on connecting test box for wiring test.
Cylinder bank 1 and 2
- Check wires between test box and 2-pin connector to Engine Control Module for open circuit according to wiring diagram. Wiring resistance: max. 1.5 ohms
Cylinder bank 1
Cylinder bank 2
Cylinder bank 1 and 2
- Check the wire for short circuit to B+ and Ground (GND). Specification: infinite ohms
- Check wire between 1-pin connector terminal 2 and Motronic Engine Control Module (ECM) Power Supply Relay (J271) for open circuit according to wiring diagram. Wiring resistance: max. 1.5 ohms
- Erase DTC memory of Engine Control Module => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09, Diagnostic mode 4: Reset/erase diagnostic data.
- Generate readiness code => [ Readiness Code, Generating ] Monitors, Trips, Drive Cycles and Readiness Codes.
If no malfunctions are detected in the wires and the resistance value is OK:
Cylinder bank 1
- Replace Engine Control Module (ECM) (J623)l.
Cylinder bank 2
- Replace Engine Control Module (ECM) 2 (J624).