Relay Carrier in Right Front Footwell
Relay Carrier in Right Front Footwell
Removing
- With ignition switched off, disconnect battery Ground (GND) wire. Refer to=> [ Battery, Disconnecting and Connecting ] Battery.
- Remove glove compartment => Body Interior 68 Removal and Installation.
- Remove lower A-pillar trim.
- Fold back floor carpet.
- Remove footrest.
- Disconnect relay - 1 -.
- Remove bolts - arrows - and detach relay carrier from bulkhead.
- Disconnect relays/fuses from relay carrier.
- Unclip fuse boxes and relay carriers at relay carrier.
• Precise assignment of relay carrier in front right footwell can be seen from appropriate wiring diagram.
Installing
Install in reverse order of removal, observing the following:
- Install lower A-pillar trim.
- Install glove compartment => Body Interior 68 Removal and Installation.
- Connect battery. Refer to=> [ Battery, Disconnecting and Connecting ] Battery.