Operation CHARM: Car repair manuals for everyone.

Procedures



Turbocharger

NOTE:
- Observe cleanliness rules.
- Secure all hose connections using hose clamps appropriate for the model type.
- Hose connections and charge air system hoses must be free of oil and grease before installing. Sealing ring and sealing surfaces must only be lightly oiled with connector couplings.
- Charge air system must be properly sealed.
- Replace self-locking nuts.







- Pliers for spring clamps VAS 5024A or Hose clamp pliers V.A.G 1921 are recommended for installing spring clamps.
- Add oil to turbocharger through oil feed line connecting piece.
- After installing turbocharger, let engine idle for approx. 1 minute without increasing engine speed. This ensures adequate oil supply to the turbocharger.

Assembly of hose connections with connection couplings