Operation CHARM: Car repair manuals for everyone.

Valvetrain Assembly Overview






Valvetrain Assembly Overview

Cylinder head for cylinder bank 2 (left) is shown in illustration.





1 Sealing plug

2 Valve stem seal

Replacing with the cylinder head installed, refer to => [ Valve Stem Seals, Cylinder Head Installed ] Valve Stem Seals, Cylinder Head Installed

Replacing with the cylinder head removed => [ Valve Stem Seals, with Cylinder Head Removed ] Valve Stem Seals, With Cylinder Head Removed

3 Valve spring

Installed location => [ Installed position of valve spring ]

4 Support element

With hydraulic valve clearance compensation

Clipped into roller rocker lever - item 8 -

Checking, refer to => [ Support Elements with Hydraulic Adjustment, Checking ] Testing and Inspection

Mark for re-installation

Lubricate contact surface

5 Valve spring plate

6 Valve keys

7 Securing clip

Check for secure seat

8 Roller rocker lever

Mark for re-installation

Check roller for easy movement

Lubricate contact surface

To assemble, clip onto support element - 4 - with securing clip - 7 -

9 Intake camshaft

Removing and installing, refer to => [ Camshafts ] Removal and Replacement

Measuring axial play, refer to => [ Camshaft, Measuring Axial Play ] Testing and Inspection

Measure radial clearance using Plastigage(R) (roller rocker lever removed)

Radial clearance at bearing-dia. 24 mm: 0.024 to 0.066 mm

Radial clearance at bearing-dia. 36 mm: 0.032 to 0.078 mm

Run-out: maximum 0.04 mm

10 Gasket

Replace

11 Bearing bracket

With integrated camshaft bearings

Removing and installing, refer to => [ Camshafts ] Removal and Replacement

12 Bolt

Tightening order => [ Guide frame tightening sequence ]

13 Camshaft position (CMP) sensor 2 (G163)

14 Bolt

9 Nm

15 O-ring

Replace

16 Bolt

9 Nm

17 Camshaft position (CMP) sensor 4 (G301)

18 O-ring

Replace

19 Compression ring

For camshaft adjuster

20 Exhaust camshaft

Removing and installing, refer to => [ Camshafts ] Removal and Replacement

Measuring axial play, refer to => [ Camshaft, Measuring Axial Play ] Testing and Inspection

Measure radial clearance using Plastigage(R) (roller rocker lever removed)

Radial clearance at bearing-dia. 24 mm: 0.024 to 0.066 mm

Radial clearance at bearing-dia. 36 mm: 0.032 to 0.078 mm

Run-out: maximum 0.04 mm

21 Cylinder Head

Check valve guides, refer to => [ Valve Guides, Checking ] Testing and Inspection

22 Intake valve

Do not rework, only lapping is permitted

Mark installed position for re-installation

Valve dimensions, refer to => [ Valve Dimensions ] [1][2]Specifications

Check valve guides, refer to => [ Valve Guides, Checking ] Testing and Inspection

23 Exhaust valve

Do not rework, only lapping is permitted

Mark installed position for re-installation

Valve dimensions, refer to => [ Valve Dimensions ] [1][2]Specifications

Check valve guides, refer to => [ Valve Guides, Checking ] Testing and Inspection

Guide frame tightening sequence





- Tighten bolts in 2 stages in sequence - 1 to 24 - as follows.

- Install bolts by hand as far as stop.

- Tighten bolts to 8 Nm.

Installed position of valve spring





The tight spring coils - arrow - face toward cylinder head.