Heating and Air Conditioning: Adjustments
Drive Plate Run-Out with Overload Protection, Checking and Adjusting
- Remove compressor, refer to => [ Compressor ] Compressor.
- Clean flange at drive plate - A -.
- Secure a dial gauge - B - using a dial gauge holder - C - (for example, using dial gauge holder (VW 387) ) on compressor.
- Set probe of dial gauge - D - on flange of drive plate - A - with a pre-tension of approximately 1.0 mm.
- Turn compressor drive unit - E - several rotations.
Specification:
Run-out deviation is less than 0.21 mm (run-out of dial indicator, difference between smallest and largest measured value 0.2 mm maximum)
- If run-out deviation is greater than 0.2 mm, loosen bolts on drive plate, refer to => [ Drive Plate with Overload Protection ] Drive Plate With Overload Protection and re-adjust drive plate.