Instrument Panel Central Tube
Instrument Panel Central Tube
• Pry lever 80-200
Removal
- Remove instrument panel. Refer to => [ Instrument Panel ] Instrument Panel.
- Remove center section of the instrument panel. Refer to => [ Instrument Panel Center Section ] Storage Compartments and Covers.
- Remove bolts - 1 - (Qty. 2) of fuse carrier - 2 -. Tightening specification 3 Nm.
- Lay down fuse carrier with connected wires.
- Disengage wiring harness on instrument panel carrier and free it up.
- Remove bolts - 1 - (Qty. 2) of 3-socket relay carrier - 2 -. Tightening specification 3 Nm.
- Remove nuts - 3 - (Qty. 2) of 6-socket relay carrier - 4 - with control module for vehicle electrical system. Tightening specification 2.4 Nm.
- Lay down relay carrier with connected wires.
- Remove wiring harness behind relay carriers from central tube and free it up.
- Remove bolt - 2 - of pedal bracket. Tightening specification 23 Nm.
- Remove bolts - 1 - (Qty. 4). Tightening specification 22 Nm.
- Place steering column in driver's footwell.
- Remove bolts - 1 - (Qty. 4) of left brace. Tightening specification 9 Nm.
- Remove screw - 2 -. Tightening specification 8 Nm.
• If brace remains installed, it is sufficient to only loosen bolt - 3 - and swing brace downward.
- Loosen/remove bolt - 3 - (front mount for brace on air conditioner). Tightening specification 8 Nm.
- Remove support or tilt it downward.
- Remove bolts - 1 - (Qty. 4). Tightening specification 9 Nm.
- Expose cable - 2 -.
- Remove right support.
- Remove bolts - 1 - (Qty. 2) of bracket for air conditioner. Tightening specification 9 Nm.
- Pry both cover caps - 3 - out with a screwdriver.
- Loosen hex nuts - 4 - a few turns.
- Loosen wiper arm - 2 - from wiper axle by tilting slightly.
- Completely remove hex nuts and remove wiper arm.
- Remove securing clips - 1 - and remove cowl panel grille - 5 -.
- Remove the cover for the E-box plenum chamber -arrows-.
- Carefully pry off mounting bracket - arrow - assisted with a screwdriver and lay Engine Control Module (ECM) with attached wires aside.
- Unclip retaining bracket.
- If present, lay aside transmission control module with wiring connected.
- Remove bolts - 2 - (Qty. 2) of connector station. Tightening specification 3 Nm.
- Remove central tube bolt - 1 - for instrument panel in plenum chamber. Tightening specification 6 Nm.
- Remove the left nuts - 1 - (Qty. 2). Tightening specification 35 Nm.
- Remove upper bolt - 3 -. Tightening specification 6 Nm.
- Unscrew Ground (GND) wires - 2 -.
- Remove the right nut - 2 -. Tightening specification 35 Nm.
- Remove upper bolt - 3 -. Tightening specification 6 Nm.
- Unscrew Ground (GND) wires - 1 -.
- Pull instrument panel central tube forward a few mm.
- Pull out pins - 2 - (Qty. 2) preferably upward using a small screwdriver.
- Free up electrical wiring harness behind vent.
- Remove air guide upward - arrow -.
- Unscrew Ground (GND) wires - 1 -.
- Press off wiring harness behind central tube for instrument panel from central tube for instrument panel - arrows -.
- Use lever 80-200.
- Remove instrument panel central tube.