Cylinder Head, Removing






Cylinder Head, Removing

Special tools, testers and auxiliary items required

Lifting Tackle (3033)

Shop Crane (VAS 6100)

Procedure

Engine installed.

All cable ties which are opened or cut open when removing, must be replaced in the same position when installing.

Heat shield boots that were removed should be installed in the same location during installation.

Perform oil change if engine oil is contaminated.

- Drain the coolant. Refer to => [ Cooling System, Draining and Filling ] Procedures.

- Remove the intake manifold.

- Remove coolant hoses to heater core on bulkhead - arrows -.





- Disconnect following hose connections:





1. Coolant hose to reservoir

2. Vacuum hose to Evaporative Emission (EVAP) Canister

3. Vacuum hose to Leak Detection Pump

4. Fuel supply line

5. Coolant hose to reservoir

- Disconnect coolant hoses at positions indicated by - arrows -.





Ignore - 1 -.

Shown in illustration on vehicle with Direct Shift Gearbox transmission.

- Remove wiring connections with coolant and vacuum hoses.

- Remove camshaft timing chain from camshafts. Refer to => [ Camshaft Timing Chain ] Camshaft Timing Chain.

Do not bend the flex joints in front of the exhaust pipe more than 30° or they may be damaged.

- Remove front exhaust pipe from exhaust manifolds - arrows -.





- Loosen and remove cylinder head bolts in sequence shown.





- Engage (3033) as follows:





Belt pulley side: Position - 3 -.

Timing chain side: Position - 10 -.

(3033) positions marked with 1 to 12 face toward timing chain side.

- Carefully raise cylinder head.

- Place clean cloth in cylinder so that no dirt can enter between cylinder wall and pistons.