Operation CHARM: Car repair manuals for everyone.

Diagram 1/18 (Tracks 225-238)






IMPORTANT NOTE:
This manufacturer uses "Track" style wiring diagrams.
For information on how to use these diagrams effectively, please refer to Diagram Information and Instructions. Diagram Information and Instructions


Engine control module, EVAP canister purge regulator valve 1, Secondary air injection solenoid valve, Oil pressure regulation valve, Transmission coolant valve, Cylinder head coolant valve





ws = white
sw = black
ro = red
br = brown
gn = green
bl = blue
gr = grey
li = lilac
ge = yellow
or = orange
rs = pink

J623 - Engine control module Control Modules in Front Part Of Vehicle

N80 - EVAP canister purge regulator valve 1 Locations

N112 - Secondary air injection solenoid valve Locations

N320 - Secondary air injection solenoid valve 2 Locations

N428 - Oil pressure regulation valve Locations

N488 - Transmission coolant valve Locations

N489 - Cylinder head coolant valve Locations

T2bh - Double connector

T2br - Double connector

T2cc - Double connector

T2ft - Double connector

T2fx - Double connector

T2fz - Double connector

T91 - 91-pin connector Engine Control Module (ECM) -J623-

T105 - 105-pin connector Engine Control Module (ECM) -J623-

(D180) - Connection (87a) (in engine compartment wiring harness)

Previous Diagram 1/17 (Tracks 211-224)

Next Diagram 1/19 (Tracks 239-252)