Operation CHARM: Car repair manuals for everyone.

Secondary Air Injection Pump Motor, Checking






Secondary Air Injection Pump Motor, Checking

Special tools, testers and auxiliary items required

Multimeter.

Wiring diagram.

Test requirements

Fuse (S130) OK.

The Secondary Air Injection (AIR) Pump Relay (-J299-) OK.

Battery voltage at least 12.5 V.

All electrical consumers switched off.

A/C switched off.

The ignition switched off.

Test procedure

- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check.

Start diagnosis

- Install the protective body covers.

A second technician must hold the lid securely while the rear lid gas-filled strut - 3 - is disengaged from the lower left joints.





- Using a screwdriver - 1 -, remove the retaining spring - 2 - and remove the gas-filled strut from the ball stud.

- Remove the power steering reservoir cap.

- Loosen the quick-release fasteners and remove the left engine compartment trim - 1 -.





- Reinstall the gas-filled strut back onto the ball studs.

- Disconnect the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector - 3 -.





Checking voltage

- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminals 1 to 2 for voltage.

- Crank the engine.





- Switch the ignition off.

Specified value: battery voltage.

If the specified value was not obtained:

- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminal 2 to Ground (GND).





Specified value: battery voltage.

If the specified value was not obtained:

- Check the wiring connection from the Secondary Air Injection (AIR) Pump Relay (-J299-) socket 8 to the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminal 2 for an open circuit or a short circuit.

- Check the wiring connections for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

If the specified value was obtained:

Checking Ground (GND)

- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Motor (-V101-) electrical harness connector terminal 1 to Ground (GND) for resistance.





Specified value: 1.5 ohms Max.

If the specification was not obtained:

- Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).

- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

If no malfunction is found in the wiring and voltage supply was OK:

- Replace the Secondary Air Injection (AIR) Pump Motor (-V101-).

Assembly is performed in the reverse order of the removal, note the following:

Final procedures

After repair work, the following work steps must be performed in the following sequence:

1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Mode 03 - Read DTC Memory.

2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Clearing Diagnostic Trouble Codes.

3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Readiness Code.