Cyclic Check
Cyclic CheckOnce the predrive check has been successfully completed and the system is ready for operation, a cyclic check for the purposes of fault monitoring is performed. The cyclic check continues to be carried out as long as the system status is Terminal R ON.
The following tests are performed as part of the cyclic check:
^ Monitoring of resistance of deployment circuits
^ Communication capability and status of components
^ Power supply