11 00 590 Exchange Engine
11 00 590 Exchange engine (N54, N54T)Necessary preliminary tasks:
^ Remove and install engine.
^ Mount engine on assembly stand.
^ If necessary, remove foreign bodies from turbocharger group.
^ Check all assemblies and convert to replacement power plant.
Remove transportation locks (1).
Note:
Catch escaping engine oil with a suitable cloth (2).
Transportation locks (1) are no longer needed.
Modify screw plugs (1) from old power plant.
Insert screw plugs (1).
Tightening torque: 11 42 11AZ.
Secure oil cooler lines with mounting bar (2).
Assemble engine.