Conversion of Coil-Spring Assembly to Connector System "MQS"
Conversion Of Coil-Spring Assembly To Connector System "MQS"
Following steps are important for the conversion:
1. Remove cladding of short earth cable.
2. Fit the cable and plug in.
3. Establish tension relief as shown in the following graphic:
Attach cable ties as follows:
- Cut end faces downwards.
- The part of cable between the coil-spring assembly and cable tie is not under tension (loop greater than 5 mm).