Cylinder Head Assembly: Testing and Inspection
11 12 729 - Check cylinder head for water leaks (N54)
Special tools required:
- 11 4 341
- 11 4 342
- 11 4 344
- 11 4 345
Important!
Pressure-test cylinder head to max. 3 bar.
Heat cylinder head to 60°.
Check for bubble formation in a water bath.
Necessary preliminary tasks:
- Remove cylinder head Removal and Replacement.
- Disassemble cylinder head.
Note:
Observe mounting of special tool 11 4 341 on 1cylinder.
Secure special tool 11 4 341 with bolts 11 4 345 to 25 Nm.
Install special tool 11 4 341 with special tool 11 4 345.
Installation Note:
1 cyl is marked.
Fit special tool 11 4 342 with bolts (1), insert knurled screw in direction of arrow.
Sealing flange must rest flat.
Secure special tool 11 4 344 with bolts (1).
Note:
Compressed air at valve (2) must not exceed 3 bar.
Heat cylinder head to 60°.
Check for bubble formation in a water bath.
Assemble engine.