Operation CHARM: Car repair manuals for everyone.

Removing and Installing/Replacing Inlet and Exhaust Adjustment Units on Left Side

11 36 047 Removing and installing/replacing inlet and exhaust adjustment units on left side (S63)

Special tools required:





Important!
When the engine is shut down, the inlet and exhaust adjustment unit is normally locked in its initial position.
The situation may arise in some individual cases where this initial position is not reached and the camshaft can continue to be rotated in the adjustment range of the adjustment unit.
Where central bolts are not greased at the bolt contact points up to engine number 20024295, the camshaft adjuster must be renewed due to safety reasons.
The central bolts is greased from engine number 20024296.





(cylinder bank 5 to 8)

Necessary preliminary tasks:
^ Read fault memory and make a documentary record
^ Remove left cylinder head cover
^ Remove left timing case cover
^ Check timing.





To release central bolts, use special tool 11 9 890 or grip at hexagon head of camshaft.

Important!
If special tool 11 9 890 can not be fitted, it is necessary when releasing the central bolt to grip the hexagon head of the respective camshafts.





Release central bolts (1 and 2) of inlet and exhaust adjustment units.

Installation:
Replace central bolts after releasing.





Important!
Check whether head of central bolt (1) is greased (see arrow).
If no grease can be seen on the bolt head of central bolt (1), the intake and exhaust camshaft adjuster must be renewed due to safety reasons.

Installation:
Coat contact face of central bolt (1) with copper paste.





Release hexagon socket screw.

Release special tool 11 9 900 at knurled screws and remove.





Release screws (1).

Remove upper tensioning rail (2).

Note:
Shown without special tools for purposes of clarity.





Remove central bolt (2) of inlet adjustment unit.

Installation:
Replace central bolts after releasing.





Detach inlet adjustment unit (1) in direction of arrow from inlet camshaft.

Feed out inlet adjustment unit (2) from timing chain (1).





Lift out inlet adjustment unit (2).





Remove central bolt (1) of exhaust adjustment unit.

Installation:
Replace central bolts after releasing.





Detach exhaust adjustment unit (1) in direction of arrow from exhaust camshaft.

Feed out exhaust adjustment unit (2) from timing chain (1).





Lift out exhaust adjustment unit (2).





Important!
Danger of mix-up:

Intake and exhaust adjustment units are different.

Mixing up the inlet and exhaust adjustment units will cause damage to the engine.
1. Inlet adjustment unit (1) is marked with ON
2. Exhaust adjustment unit (2) is marked with OFF





Installation:
Coat contact face of central bolt (1) with copper paste.

Note:





Position of adjustment units in relation to timing chain can be freely selected.

Feed adjustment unit into timing chain and position on camshafts.

Insert central bolts (1 and 2) on adjustment units without gaps.

Release central bolts (1 and 2) by 90°.





Fit sliding rail (2) and secure with screws (1).

Tightening torque: 11 31 4AZ.





Get special tool 11 9 890 ready for securing camshafts.

Place special tool 11 9 893 on exhaust camshaft.








Fit special tool 11 9 893 on intake camshaft.





Installation:
Align exhaust and intake camshafts so that special tools 11 9 893 lie on the cylinder head without any gap.

Screw special tool 11 9 894 into cylinder head.

Press special tool 11 9 892 down with special tool 11 9 891.








Screw in special tool 11 9 900.

Pretension timing chain with special tool 11 9 900.

Preload hexagon socket screw with special tool 00 9 250 to 0.6 Nm.





Check special tools 11 9 190 for correct seating.

Tighten down central screw (1 and 2) of the adjustment units with special tool 00 9 120.





Tightening torque 11 36 1AZ.





Remove special tools 11 9 190 and 11 8 570.

Crank engine at central bolt twice in direction of rotation until engine returns to 150° before cylinder no. 1 firing TDC position.

Mount special tool11 8 570 on vibration damper with a bolt.

Secure special tool 11 9 190 in 150° firing TDC position cylinder 1.





Check timing again.

Remove all special tools.