Operation CHARM: Car repair manuals for everyone.

Turbocharger

11 65 Connection diagram, vacuum activation (N74)





1 Connector to the exhaust flaps.
2 Connection, vacuum unit (wastegate valve), cylinder bank 2, cylinder pair 7 to 12.
3 Vacuum line to vacuum pump.
4 Connection, vacuum unit (wastegate valve), cylinder bank 1, cylinder pair 1 to 6.
5 Vacuum line, distributor to vacuum container.





T-piece (1) of vacuum line to the vacuum containers.

Connector (2) vacuum line to electro-pneumatic pressure converter (EPDW), cylinders 7 to 12, VAC connection.

Connector (3) vacuum line to electro-pneumatic pressure converter (EPDW), cylinders 1 to 6, VAC connection.