Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
To Grind Valves, Add2.20.0A
With AC, Add
Right Bank0.50.0A
Left Bank0.20.0A
Both Banks0.50.0A
With A.I.R., Add
Right Bank0.90.0A
Left Bank0.20.0A
Both Banks0.90.0A
One CYL
Right Bank9.80.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank10.60.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks12.90.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
All Cyls
Right Bank11.90.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank12.70.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks16.10.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.