Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank9.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Left Bank10.60.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Both Banks12.90.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
All Cyls
Right Bank11.50.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Left Bank12.30.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Both Banks16.10.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Note
With AC, Add
Right Bank0.50.0A
Left Bank0.20.0A
Both Banks0.50.0A
To Grind Valves, Add2.20.0A
With A.I.R., Add
Right Bank0.90.0A
Left Bank0.20.0A
Both Banks0.90.0A