Valve: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Resurface/Grind | ||||
| One CYL | ||||
| Right Bank | 6.0 | 0.0 | A | |
| Left Bank | 6.7 | 0.0 | A | |
| Both Banks | 9.1 | 0.0 | A | |
| Note | ||||
| With AC, Add | ||||
| Right Bank | 0.7 | 0.0 | A | |
| Left Bank | 0.2 | 0.0 | A | |
| Both Banks | 0.7 | 0.0 | A | |
| With A.I.R., Add | ||||
| Right Bank | 0.8 | 0.0 | A | |
| Left Bank | 0.4 | 0.0 | A | |
| Both Banks | 0.8 | 0.0 | A | |
| All Cyls | ||||
| Right Bank | 7.1 | 0.0 | A | |
| Left Bank | 7.8 | 0.0 | A | |
| Both Banks | 11.3 | 0.0 | A | |
| Note | ||||
| With AC, Add | ||||
| Left Bank | 0.2 | 0.0 | A | |
| Both Banks | 0.7 | 0.0 | A | |
| Right Bank | 0.7 | 0.0 | A | |
| With A.I.R., Add | ||||
| Right Bank | 0.8 | 0.0 | A | |
| Left Bank | 0.4 | 0.0 | A | |
| Both Banks | 0.8 | 0.0 | A | |
| With Cruise Control, Add | 0.4 | 0.0 | A | |
| Add the Following Operations If Performed With Valves, Grind | ||||
| Tune-Up | 0.8 | 0.0 | A | |
| Valve Guides. Ream | ||||
| Each | 0.1 | 0.0 | A | |
| Valve Guides, Renew | ||||
| Each | 0.2 | 0.0 | A | |
| Camshaft, Renew | 0.2 | 0.0 | A |