Piston: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Crankshaft, Renew | 0.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |
| One CYL | ||||
| Right Bank | 9.1 | 0.0 | A | |
| Left Bank | 8.7 | 0.0 | A | |
| Both Banks | 11.1 | 0.0 | A | |
| Note | ||||
| With AC, Add | ||||
| Right or Both Banks | 0.8 | 0.0 | A | |
| Left Bank | 0.2 | 0.0 | A | |
| To Grind Valves, Add | 1.7 | 0.0 | A | |
| All Cyls | ||||
| Right Bank | 10.5 | 0.0 | A | |
| Left Bank | 10.1 | 0.0 | A | |
| Both Banks | 13.7 | 0.0 | A | |
| Note | ||||
| With AC, Add | ||||
| Right or Both Banks | 0.8 | 0.0 | A | |
| Left Bank | 0.2 | 0.0 | A | |
| To Grind Valves, Add | 1.7 | 0.0 | A |