Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Right Bank13.110.1AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Left Bank12.29.2AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks17.113.1AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.70.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew4.20.0ADoes Not Include: R&R Engine
Oil Pump, Renew1.20.0ADoes Not Include: R&R Engine
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine
Rear Main Oil Seal, Renew4.00.0ADoes Not Include: R&R Engine
Timing Chain & Gears, Renew2.30.0ADoes Not Include: R&R Engine
Valves, Grind
    See Valves Grind Head Removed And Combinations.