Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Right Bank12.29.2AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.80.5Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank12.09.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.80.5Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Both Banks19.814.8AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.80.5Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
One Cylinder
Note
With AC, Add0.80.5Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
All Cylinders
Note
With AC, Add0.80.5Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.20.0AAdd The Following Operation If Performed Along With Piston & Ring Job
Crankshaft, Renew3.00.0AAdd The Following Operation If Performed Along With Piston & Ring Job
Oil Pump, Renew0.20.0AAdd The Following Operation If Performed Along With Piston & Ring Job
Oil Pump Screen, Clean0.20.0AAdd The Following Operation If Performed Along With Piston & Ring Job
Rear Main Oil Seal, Renew0.70.0AAdd The Following Operation If Performed Along With Piston & Ring Job
Timing Chain or Gears, Renew1.50.0AAdd The Following Operation If Performed Along With Piston & Ring Job
Valves Grind
    See Valves Grind Head Removed & Combinations.