Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank11.08.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank10.67.6AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks13.010.5AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
All Cylinders
Right Bank11.48.4AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank11.08.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks19.612.6AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.30.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Crankshaft, Renew4.80.0ADoes Not Include: R&R Engine
Oil Pump, Renew1.00.0ADoes Not Include: R&R Engine
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine
Rear Main Oil Seal, Renew1.00.0ADoes Not Include: R&R Engine
Timing Chain, Renew2.00.0ADoes Not Include: R&R Engine
Tune-Up0.70.0ASee Valves, Grind Head Removed And Combinations.
Valves, Grind
    See Valves, Grind Head Removed And Combinations.