Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew0.90.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft3.30.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.90.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Oil Seal, Renew1.20.0ADoes Not Include: R&R Engine.
Timing Chain & Gears, Renew2.10.0ADoes Not Include: R&R Engine.
Tune-Up0.60.0ADoes Not Include: R&R Engine.
All Cyls
-23117.011.0AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.80.5AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.