Operation CHARM: Car repair manuals for everyone.

Crankshaft: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace10.87.7AIncludes: R&R Engine.
Note
To R&R Cylinder Head, Add
One Bank3.22.3A
Both Banks4.33.1A
With AC, Add1.00.7A
With A.I.R., Add0.80.5A
To Replace Piston Rings, Add
One CYL0.70.4A
All Cyls2.82.0A
To Replace Connecting Rod, Add
One CYL0.50.3A
All Cyls2.01.4A
To Replace Piston, Add
One CYL0.90.6A
All Cyls4.53.2A