| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Complete Assembly With Transfer of Parts | 8.4 | 6.0 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| NOTE |
| With A.I.R., Add | 0.8 | 0.5 | B | |
| Complete Assembly Without Transfer of Parts | 6.0 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Note |
| With A.I.R., Add | 0.5 | 0.0 | B | |
| Long Block | 15.9 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| NOTE |
| With A/C, Add | 0.5 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.7 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up. |
| With Locking Wheel Covers, Add | 0.2 | 0.0 | A | |
| With Locking Lug Nuts, Add | 0.2 | 0.0 | A | |
| Short Block (Partial) | 12.2 | 8.7 | A | Includes: R&R Engine & Transfer All Necessary Parts. |
| NOTE |
| With A.I.R., Add | 0.8 | 0.5 | A | |
| To Grind Valves, Add | 2.8 | 2.0 | A | |
| Overhaul/Rebuild | 27.1 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up. |
| NOTE |
| With A/C, Add | 0.5 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.7 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up. |
| With Locking Wheel Covers, Add | 0.2 | 0.0 | A | |
| With Locking Lug Nuts, Add | 0.2 | 0.0 | A | |