Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.70.0B
Oil Pump, Renew1.30.0B
Timing Chain, Renew1.10.0B
Tune-Up0.60.0B
One CYL
Right Bank10.17.2B
Left Bank11.88.4B
Both Banks13.69.7B
Note
With AC, Add0.70.4B
With A.I.R., Add0.80.5B
With Turbo, Add0.40.2B
To Grind Valves, Add2.82.0B
All Cyls
Right Bank12.08.6B
Left Bank13.79.8B
Both Banks17.212.3B
Note
With AC, Add0.70.4B
To Grind Valves, Add2.82.0B
With A.I.R., Add0.80.5B
With Turbo, Add0.40.2B