Operation CHARM: Car repair manuals for everyone.

Engine: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Complete Assembly With Transfer of Parts8.86.4BIncludes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment.
Note
With Locking Wheel Covers, Add0.20.0B
With Locking Lug Nuts, Add0.20.0B
Complete Assembly Without Transfer of Parts6.40.0BDoes Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
Note
With Locking Wheel Covers, Add0.20.0B
With Locking Lug Nuts, Add0.20.0B
Long Block17.70.0BIncludes: R&I Engine & Transfer All Necessary Components Not Supplied With Long Block
Note
With A/C, Add0.80.5A
With A.I.R. Pump, Add0.60.5B
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A
Short Block20.110.7A
Short Block (Partial)14.710.7AIncludes: R&R Engine & Transfer All Necessary Parts.
NOTE
To Grind Valves, Add2.82.0A
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A
Overhaul/Rebuild27.10.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
NOTE
With A/C, Add0.50.0A
With A.I.R. Pump, Add0.70.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A