Operation CHARM: Car repair manuals for everyone.

Module Power

Battery positive voltage is applied on CKT 540 (ORN) and CKT 640 (ORN) to the body control module (MALL) connector C1 terminal H and terminal G respectively. With the ignition switch in the RUN or the START position, the ignition positive voltage is applied on CKT 39 (PNK) to the MALL module connector C2 terminal C13.