DISASSEMBLY PROCEDURE



1. Make scribe marks (3) on the following components in order to ensure correct alignment during reassembly:
^ The drive end frame (1).
^ The slip ring end frame (2).




2. Remove the 4 through bolts.
3. Separate the slip ring end frame and the drive end frame.




4. Remove the stator lead attaching nuts.
5. Remove the stator from the slip ring end frame.
6. Inspect the stator. Refer to step 1 in Inspection Procedure. Generator Overhaul Inspection Procedure




7. Tap the plastic dust shield retaining pin (2) inward just enough for the retaining clips to release.




8. Remove the brush holder screw.
9. Remove the voltage regulator insulated screw.
10. Remove the voltage regulator and the brush holder with the dust shield from the slip ring end frame as a unit.




11. Remove the dust shield from the brush holder. The brushes and springs will be loose inside.
12. Inspect the brush holder assembly. Refer to step 4.3 in Inspection Procedure. Generator Overhaul Inspection Procedure
Do the following:
12.1. Clean the brushes with a dry soft cloth.
12.2. Place the springs into the brush holder.
12.3. Turn each brush so that the wire aligns with the slot in the brush holder and push each brush into the holder. Make sure the wires are looped loosely and are not pinched or kinked. Install a nonmetallic pin through the holes in the brush holder to hold the brushes in a retracted position for later reassembly.

NOTE: Avoid excessive heat during the soldering and unsoldering procedures. Excessive heat will damage the voltage regulator.

13. Inspect the voltage regulator. Refer to step 4.4 in Inspection Procedure. If necessary, disassemble the voltage regulator, the brush holder and the connector strap assembly. Generator Overhaul Inspection Procedure
In order to disassemble the components:
^ Unsolder the connector clips between the voltage regulator and the brush holder, and between the voltage regulator and the connector strap.
^ Disassemble the parts while the solder is still soft.




14. Inspect the slip ring end assembly. Refer to step 4 in Inspection Procedure. If necessary remove the capacitor and the rectifier bridge. Generator Overhaul Inspection Procedure
^ Remove the bolts.
^ Remove the washers.
^ Disconnect the leads.
^ Remove the capacitor.
^ Remove the rectifier bridge.




15. Inspect the slip ring end bearing. If the bearing is dry or damaged, replace the bearing. Remove the slip ring end bearing only if necessary.




16. Inspect the drive end assembly. Refer to step 2 in Inspection Procedure. If necessary, disassemble the drive end assembly by removing the following parts from the drive end frame: Generator Overhaul Inspection Procedure
^ The nut
^ The washer
^ The pulley
^ The fan collar
^ The fan
^ The outside collar
^ The rotor
^ Remove the inside collar from the rotor.

ASSEMBLY PROCEDURE



1. Install the inside collar into the rotor.
2. Install the rotor into the drive end frame.

NOTE: Refer to Fastener Notice in Cautions and Notices.

3. Install the following components onto the rotor shaft:
^ The outside collar
^ The fan
^ The fan collar
^ The pulley
^ The washer
^ The generator shaft nut

Tighten
Tighten the generator shaft nut to 100 Nm (74 lb ft).




4. Install the bearing into the slip ring end frame from the outside, until the bearing is flush with the outside shoulder of the slip ring end frame. Use tooling to make sure that force is applied to the outer bearing race only.





IMPORTANT: In order to ensure proper operation of the unit, install the slip ring end frame components in the correct order.

5. Install the rectifier bridge.

IMPORTANT: Install the capacitor with the insulator material resting against the drive end frame.

6. Install the capacitor.

IMPORTANT: Make sure that the insulated bolt, located at the capacitor/rectifier bridge, attaches the capacitor strap and the rectifier bridge to the slip ring end frame. Make sure that the metal side of the capacitor strap is against the regulator connection.

7. Install the bolts.

Tighten
Tighten the bolts to 2.5 Nm (22 lb in).




8. Install the brushes into the brush holder with the retaining pin.

NOTE: Avoid excessive heat during the soldering and unsoldering procedures. Excessive heat will damage the voltage regulator.

9. Install the connector strap and the brush holder onto the regulator. Make sure the solder clips fit snugly. Solder the clips in place.
10. Install the dust shield onto the brush holder.




11. Install the voltage regulator, the brush holder, the dust shield, and the connector strap assembly into the slip ring end frame as one unit.
12. Tap the plastic retaining pin on the dust shield into the retaining clip until flush with the outside of the housing. Make sure that the brush retaining pin goes through the access hole to the outside of the slip ring end frame for removal after the generator is assembled.
13. Install the insulated regulator bolt.

Tighten
Tighten the insulated regulator bolt to 2.5 Nm (22 lb in).

14. Install the brush holder bolt.

Tighten
Tighten the brush holder bolt to 2.5 Nm (22 lb in).




15. Place the stator terminals over the rectifier bridge terminals in order to assemble the stator.
16. Install the stator lead nuts.

Tighten
Tighten the stator lead nuts to 2.5 Nm (22 lb in).




17. Assemble the slip ring (2) and drive end (1) frames. Note the scribe marks (3).
18. Install the through bolts.

Tighten
Tighten the through bolts to 8 Nm (71 lb in).

19. Remove the retaining pin in order to release the brushes against the slip rings.