Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Right Bank13.30.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank12.60.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Both Banks20.90.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.40.0A