Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL Each Side15.80.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R. Pump, Add0.40.0A
One CYL
Right Bank11.80.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank11.50.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Each Additional1.00.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
All CYL17.50.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.