Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL Each Side12.910.4AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
One CYL
Right Bank11.48.9AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank11.48.9AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
All CYL16.812.8AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.