Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL Each Side12.910.4AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.20.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.00.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.20.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Oil Seal, Renew0.40.0ADoes Not Include: R&R Engine.
Timing Chain, Renew1.30.0ADoes Not Include: R&R Engine.
Tune-Up0.70.0ASee Valves, Grind Head Removed And Combinations.
Valves Grind
    See Valves, Grind Head Removed And Combinations.
One CYL
Right Bank11.48.9AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank11.48.9AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
All CYL16.812.8AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.