| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Right Bank | 10.6 | 7.6 | A | Includes: R&R Cylinder Head And Make All Necessary Adjustments. |
| Left Bank | 9.9 | 6.9 | A | Includes: R&R Cylinder Head And Make All Necessary Adjustments. |
| Both Banks | 14.2 | 10.2 | A | Includes: R&R Cylinder Head And Make All Necessary Adjustments. |
| Add the Following Operations If Performed With Valves, Grind |
| Valve Guides, Knurl |
| Each | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Tune-Up | 0.6 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Rocker Arm Stud, Renew |
| Each | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Timing Chain, Renew | 1.5 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Valve Lifters, Renew | 2.3 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Camshaft, Renew | 5.5 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Valves Guides, Renew |
| Each | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
| Note |
| To Ream Guide, Add | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |